Wednesday, March 30, 2011
March 30
Today in class we... Turned in 3.1.5 Variable Functions Completed 3.1.6 Open and Closed Loop Systems due Friday
Tuesday, March 29, 2011
March 28
Today in class we...
Turned in 3.1.3 and 3.1.4
Completed 3.1.5 variable functions due on Wednesday.
Turned in 3.1.3 and 3.1.4
Completed 3.1.5 variable functions due on Wednesday.
Thursday, March 24, 2011
New Feature: Follow by Email!
If you are interested in having posts from this blog delivered automatically to your email inbox, please enter your email address at right. You might also leave me a comment so that I know you are reading. Thanks!
Tuesday, March 22, 2011
March 22
Today in class we...
Turned in 3.1.1 Inputs and Outputs and 3.1.2 Flowcharting
Completed 3.1.3 Basic Programming, have Mrs. Cone sign off after viewing your program's functionality.
Turned in 3.1.1 Inputs and Outputs and 3.1.2 Flowcharting
Completed 3.1.3 Basic Programming, have Mrs. Cone sign off after viewing your program's functionality.
Friday, March 18, 2011
March 18
Today in class we...
Worked on finishing 3.1.1 Inputs and Outputs and 3.1.2 Flowcharts.
These two activities should be done after today. (In other words due Tuesday)
Worked on finishing 3.1.1 Inputs and Outputs and 3.1.2 Flowcharts.
These two activities should be done after today. (In other words due Tuesday)
Thursday, March 17, 2011
March 16
Today in class we...
Met in the drafting room due to early release
Viewed Flowchart PowerPoint presentation
Started working on Activity 3.1.2 Flowcharts
Friday will be a day to finish 3.1.1 and 3.1.2 and they will both be due on Tuesday.
Met in the drafting room due to early release
Viewed Flowchart PowerPoint presentation
Started working on Activity 3.1.2 Flowcharts
Friday will be a day to finish 3.1.1 and 3.1.2 and they will both be due on Tuesday.
Monday, March 14, 2011
March 14
Today in class...
Get a laptop, Robo Interface, power cord, and USB cable
Go to the PLTW Class drive on the computer, POE folder, ROBOPRO folder
Open ROBOPRO Windows 7 document
Hold control and click on the link to open the installer
Install ROBOPRO
Connect Interface to laptop
Open ROBOpro software...follow instructions on the test interface page.
Complete activity 3.1.1
If you finish, you may start working on 3.1.2
Get a laptop, Robo Interface, power cord, and USB cable
Go to the PLTW Class drive on the computer, POE folder, ROBOPRO folder
Open ROBOPRO Windows 7 document
Hold control and click on the link to open the installer
Install ROBOPRO
Connect Interface to laptop
Open ROBOpro software...follow instructions on the test interface page.
Complete activity 3.1.1
If you finish, you may start working on 3.1.2
Friday, March 11, 2011
March 10
Today in class we...
Worked on finishing our Bridge Design Projects they were due at the end of class
Worked on Career Demand, Salary and Education paper. This is due on April 11.
Worked on finishing our Bridge Design Projects they were due at the end of class
Worked on Career Demand, Salary and Education paper. This is due on April 11.
Tuesday, March 8, 2011
March 8
Today in class we...
Assigned Career Demand, Salary and Education Research Project. This project is due on April 11th.
Discussed Key Terms relating to Machine Control Systems. Assigned Key Terms Crossword Extra Credit Assignment due on March 10th.
Disassembled and put away the fishertechnik parts from the previous activity.
Assembled the fishertechnik parts required for activity 3.1.1 and learned how to test connectivity. Add reference sheet regarding testing connectivity to Engineering Notebooks.
Worked on completing the two projects that are currently in progress...
1) Activity 2.4.1 Bridge Design due Thursday March 10
2) Career Demand, Salary, and Education paper due April 11
Engineering Notebook Summary:
What career are you planning on researching for the CDSE paper?
What steps do you need to finish for the Bridge Design Documentation?
Assigned Career Demand, Salary and Education Research Project. This project is due on April 11th.
Discussed Key Terms relating to Machine Control Systems. Assigned Key Terms Crossword Extra Credit Assignment due on March 10th.
Disassembled and put away the fishertechnik parts from the previous activity.
Assembled the fishertechnik parts required for activity 3.1.1 and learned how to test connectivity. Add reference sheet regarding testing connectivity to Engineering Notebooks.
Worked on completing the two projects that are currently in progress...
1) Activity 2.4.1 Bridge Design due Thursday March 10
2) Career Demand, Salary, and Education paper due April 11
Engineering Notebook Summary:
What career are you planning on researching for the CDSE paper?
What steps do you need to finish for the Bridge Design Documentation?
Friday, March 4, 2011
2.4.1 Bridge Design Work Day 2
Today, March 4, in class we...
finished working on our bridge design project including all of the documentation for the project
the final project is due on Thursday March 10
today is the final day to work on this project in class
finished working on our bridge design project including all of the documentation for the project
the final project is due on Thursday March 10
today is the final day to work on this project in class
2.4.1 Bridge Design Work Day
Today, March 2, in class we...
had a substitute teacher
worked on completing our bridge design project
the due date for this project has been extended to Thursday March 10 due to the missed class period on Monday
had a substitute teacher
worked on completing our bridge design project
the due date for this project has been extended to Thursday March 10 due to the missed class period on Monday
Subscribe to:
Comments (Atom)