Tuesday, January 31, 2012

Tuesday 1-31, Wednesday 2-1

Topic: Introduction to Manufacturing
Assignment: 2.2.2 Manufacturing Process
Due Date: Start of class on Thursday/Friday
Groups: Same (Although you will only be working with the component you modeled in 2.2.1)

Notes:
Complete Survey
Introduction to Manufacturing PPT (Take notes in engineering notebook)
Maybe watch some manufacturing videos (depends on how long PPT takes)
Complete 2.2.2 using the internet to research answers and creating a life cycle poster of your component.

Monday, January 30, 2012

Friday 1/27, Monday 1/30

Topic: Product Analysis
Assignment: 2.2.1 Product Analysis
Due Date: End of class today
Groups: Same

Notes: Finalize 3-D modeling of assigned component. Complete Conclusion Questions. Assemble final project to turn in at the end of class today.

Wednesday, January 25, 2012

Wednesday 1-25, Thursday 1-26

Topic: Product Analysis
Assignment: 2.2.1 Product Analysis
Due Date: Due Friday/Monday
Groups: Same

Notes: Today should be focused on the 3-d modeling of your component. Help eachother out and ask questions. Ideally this should be done by the end of class.

Self Analysis: 4 (Work Completed) 3(Time Usage) 3(Team Effort)

Tuesday, January 24, 2012

Activity 2.2.1 Product Analysis

We are working on the start of our unit on manufacturing. This first activity has us investigating what makes up everyday object. Here are some pictures of our work on this project.

Monday, January 23, 2012

Monday 1-23, Tuesday 1-24

Topic: Product Analysis
Assignment: 2.2.1 Part 1 All, Part 2 Begin (steps 10 &11)
Due Dates: Part 1: Today; Part 2: Wednesday/Thursday

Notes: Make sure to keep one packet per team complete and up to date-this is the one that will be graded. Take your time and ask questions as you go.

Self Assessment: 4 (Work Completed) 3(Time Usage) 3(Team Effort)

Thursday, January 19, 2012

Thursday 1-19, Friday 1-20

Topic: Product Analysis
Assignment: 2.2.1 Product Analysis, Part 1, Problems 3-9
Due Date: Monday/Tuesday (tenative)

Notes: Teams will turn in one project for all members. Please choose one person to be the recorder, and document everything you do in their 2.2.1 packet. Partners may need to trade jobs in order to make sure that everything is documented in the packet. Check with Mrs. Cone after each problem to make sure it is completed.

Gravity: 6.67x10^-11 nm^2/KG^2

Self Assessment: 4(Work Completed) 3(Time Usage) 3(Team Effort)

Tuesday, January 17, 2012

Welcome to Second Semester!

Date: January 17, 18
Topic: Introduction to Materials
Assignments: Activity 2.2.1 Product Analysis Steps 1-2
Due Dates: Thursday/Friday

Notes: Introduction to Materials PPT.
Worked on Key Terms Crossword (Extra Credit)

Wednesday, January 11, 2012

January 11, 12

Topic: Final Exam
Assignment: Final Exam
Due Date: Due start of class on Friday
Notes: Add these formulas to your engineering formulas sheet.

Add to Statics for Beam Deflection: DeltaMAX=(FL^3)/(48EI)
Add to Work and Power for Energy Gained/Lossed: Q=MCpDeltaT
Add to Work and Power the following constants for Cp:
CpAluminum= 900 J/KGdegreeC
CpWater=4184 J/KGdegreeC

Monday, January 9, 2012

January 9, 10

Principles of Engineering
Date: January 9
Topic: Testing
Assignment: First Semester Final Exam
Due Date: Friday, January 13 at the start of class
Notes: Add the following information to your Engineering Formula Sheet
·           Under Statics add:  
·         Under Work and Power add:              
·         Specific heat capacity of Aluminum:       
·         Specific heat capacity of Water:  

Friday, January 6, 2012

January 5, 6

Topic: Truss Design
Assignment:
2.1.7 due today
2.1.8 due today
Final Exam due 1-12
Notes:
document work and analysis in engineering notebook

Tuesday, January 3, 2012

January 3, 4

Truss Design Testing
2.1.7 Due Thursday/Friday
2.1.8 Due Thursday/Friday
Document work and conclusions in Engineering Notebook