Thursday, September 29, 2011

September 29, 30

Topic: Energy Sources
Group Members: New Partners (Luck of the draw)
Assignments: 1.1.6 due today!
1.2 Key Terms, extra credit due by the end of 1.2
1.2.1 Energy Sources due Monday/Tuesday.

Notes: Demonstrated our builds from 1.1.6
Viewed brief Power Point presetnation over Energy Sources
Discussed Key Terms
Discussed requirements for 1.2.1 and completed the two power point slides

Self Assessment:

Tuesday, September 27, 2011

September 27, 28

Topic: Energy Sources and Compound Machine Design
Groups: Same
Assignments: 1.1.6 build due at the end of class, documentation due at the start of next class. No more class time to work on this project after today.
Notes: Viewed power point presentation on Energy Sources to begin thinking about the next lesson.

(Power school was down when I went to grade daily grades from last class...will be graded after today.)

Friday, September 23, 2011

September 23, 26

Topic: Compound Machine Design Work Day
Assignment: 1.1.6 due on Septemeber 27/28?
Group Members: Same as 9-21, 22
Notes: Began working right away trying to get as close as possible to being finished with 1.1.6.
Summary:
Self Assessment:

Wednesday, September 21, 2011

September 21, 22

Topic: Compound Machine Design
Group Members: New Partners
Assignments: 1.1.4 due today
     1.1.5 due today
     Start 1.1.6 tenative due date is Sep 27, 28
Notes: Viewed power point presentation on Fischertechnik Mechanisms
Viewed video of compound machine design examples. Click Here for Examples
Discussed Design Requirements and Rubric for the Compound Machine Design project
Began Brainstorming and drawing (These pieces of the project should be your goal for today)

Tuesday, September 20, 2011

September 19, 20

Today in class we...

Turned in Ch1: 73-86
Reviewed ideas about Transformations...if you still need more help on transformations visit this site.
Completed Ch1 87-91 in class to discover rotational, reflection, and transformation symmetry
HOMEWORK: Ch1: 92-96, 100-103 due on 9-21/22

Monday, September 19, 2011

September 19, 20

Topic: Gears, Pulley Drives and Sprockets Continued
Group Members: Same
Assignment: 1.1.2 Simple Machines Practice Problems ALL Due End of CLass
     1.1.3 Gears Due Today
     1.1.4 Pulley Drives and Sprockets due next class, 9-21/22
     1.1.5 Gears, Pulley Drives and Sprockets Practice Problems due next class, 9-21/22

Notes: Work day for the 4 assignments on the table (or any make up work if necessary!)
Self Assesment __/4+___/3+___/3=___/10

Thursday, September 15, 2011

September 15, 16

Topic: Gears, Pulley Drives and Sprockets
Group Members:
Assignments:
**1.1.2 all problems due 9/19 or 20
**1.1.3 Gears due 9/19 or 20
Notes:
Viewed power point presentation on Gears, Pulley Drives and Sprockets. Took notes in our engineering notebook.
Completed Activity 1.1.3 Gears due next class
Finished 1.1.1 if necessary
Received grade print out

REMINDERS:
Robotics Club Meets Thursdays in room 121 at North Campus
Energy Resources Club starts October 5th in room 121 at North Campus
Field Trip Release Forms due back by the field trip on October 6 or 7.

Tuesday, September 13, 2011

September 13, 14

Topic: Simple Machines Investigation

Assignment: 1.1.1 all: DUE end of class
1.1.2 Problems 1-26: DUE next class

Notes:
Today in class we...
Continued working on activity 1.1.1 with the goal of finishing by the end of the period. Teams were encouraged to divide up the parts in order to complete the assignment in the given time.

REMINDERS:
Field Trip on October 6 (5th period) and 7 (1st period)...Bring Back Signed Release Form!
Robotics Club Meets Thursdays after school in Room 121 at North Campus
Energy Resources Club will begin meeting in October...ask Mrs. Cone for information!

Monday, September 12, 2011

September 9, 12

Today in class we...

Continued looking at simple machines, in particular the inclined plane, the wedge and the screw
Continued working on Activity 1.1.1. Should be done with part 1 by the end of the day, when finished with part 1 begin working on part 2.
Continued working on Activity 1.1.2. Problems 1-17 should be finished by Tuesday/Wednesday

ANNOUNCEMENTS
**Field trip to Black Hills Power Plant 5th period on October 6, 1st period on October 7
**Robotics Club meets Thursdays in Room 121 at North Campus from 3:30-5:00
**Energy Resources Club will begin meeting on Wednesdays in October
Ask me about any of these if you have questions or are interested...Thanks!

Wednesday, September 7, 2011

September 7, 8

Today in class we... Completed Activity 1.1.1 in class (due at the end of class today) Discussed Field Trip on October 6, 7...Will remind students as time gets closer. Release forms will be given out on September 12, 13 due back before the trip. Field Trip Details: Black Hills Power Plant 7:45-11:20 (So you will miss either 2nd or 6th period, make sure to get your assignment in advance) Tour the facility, Meet with engineers on location for information and a Q&A session. Homework: Start working on Activity 1.1.2. Should get the first 5-9 problems done if possible.

Friday, September 2, 2011

Simple Machines/ Activity 1.1.1

Today, September 2, 6, in class we... Turned in signed syllabus if not already done...this will become a zero if not turned in by September 9. Finished taking notes on the first three simple machines Were introduced to the fischertechnik parts and were divided up into teams Began working on Activity 1.1.1 Part 1...part one should be finished by the end of class on the 7th/8th.

Thursday, September 1, 2011

Engineering Notebook/Mechanisms

Today (August 31/September 1) in class we...

Turned in: Signed Syllabus
Walked to the Tech Center Room 211
Toured the Tech Center
Set up our Engineering Notebooks
Viewed a power point presentation on Engineering Notebooks
Started viewing a power point presentation on Mechanisms, will finish this presentation on Friday/Monday
Summary and Self Assessment in Engineering Notebooks.

Homework: Read through sample engineering notebook entries and bring questions to class on Friday/Monday.